Werris Creek to Emerald Hill CTC Upgrade

Client

ARTC (Australian Rail Track Corporation)

Location

Regional NSW

Project Description

Equipment supply, offsite construction and fit-out of signalling locations, site civil and  electrical installation, testing, and commissioning of a new signalling system. The project included signalling modifications to accommodate extensions to existing passing loops, upgrades to signalling equipment and power infrastructure, installation of cable service routes and equipment foundations, and integration with the existing signalling network. 

Scope

ASI delivered the project from procurement and offsite pre-construction through to site installation, testing, commissioning, and handback, ensuring the upgraded infrastructure was safely integrated into the operational railway while supporting increased network capacity and operational efficiency.